Singapore LNG goes solar with Total

Rate this article

By Adnan Bajic Singapore LNG Corporation (SLNG) and Total Solar Distributed Generation (DG) have signed an agreement for solar power to be implemented at the Singapore LNG terminal on Jurong Island.

Courtesy of Singapore LNG

Under the agreement, Total Solar DG will finance, build and operate a 600 kilowatts peak (kWp) rooftop solar power system, which will be installed on the rooftops of several buildings at the terminal.

The installation of the solar panels is part of SLNG’s slew of initiatives under its Green Strategy and is expected to be completed by the fourth quarter of 2020.

This rooftop solar power system will generate around

Read Full Article Here

For more great articles: LNG World News

(Visited 7 times, 1 visits today)

Comments

comments

Tagged: ,