After drilling issues, Goodrich pumping oil in Tuscaloosa Marine Shale

      View more O&G News
      If you would like to be notified of O&G News Stories, join our O&G Newsletter
      Title: Click Here to View In Original Site

      …Goodrich Petroleum Corporation of Houston, Texas, has completed its CMR-Foster Creek 20-7H-1 well in the Tuscaloosa Marine Shale in Wilkinson County. According to the company, the well was successfully drilled with a 6,200 foot lateral and fracture stimulated with 23 stages but encountered completion issues while drilling out the frac plugs with coiled tubing resulting in the loss of a bottom hole assembly and fishing tools in the well. The company replaced the coiled tubing unit with a workover rig in an attempt to remove the downhole tools but fishing operations were un-successful. The well was subsequently placed on production from the approximately 2,100 feet of usable and unobstructed lateral. The well has reached a 24-hour peak production rate of 527 barrels of oil equivalent (BOE) per day, comprised of 500 barrels of oil and 174 Mcf of gas on a 16/64 inch choke from the 2,100 feet of lateral….



      'After drilling issues, Goodrich pumping oil in Tuscaloosa Marine Shale' have no comments

      Be the first to comment this post!

      © 2012-2014 Shale Markets, LLC. Site designed and maintained by Red Rocks Consultants, LLC

      %d bloggers like this: