After drilling issues, Goodrich pumping oil in Tuscaloosa Marine Shale

      View more O&G News
      If you would like to be notified of O&G News Stories, join our O&G Newsletter
      Title: Click Here to View In Original Site

      …Goodrich Petroleum Corporation of Houston, Texas, has completed its CMR-Foster Creek 20-7H-1 well in the Tuscaloosa Marine Shale in Wilkinson County. According to the company, the well was successfully drilled with a 6,200 foot lateral and fracture stimulated with 23 stages but encountered completion issues while drilling out the frac plugs with coiled tubing resulting in the loss of a bottom hole assembly and fishing tools in the well. The company replaced the coiled tubing unit with a workover rig in an attempt to remove the downhole tools but fishing operations were un-successful. The well was subsequently placed on production from the approximately 2,100 feet of usable and unobstructed lateral. The well has reached a 24-hour peak production rate of 527 barrels of oil equivalent (BOE) per day, comprised of 500 barrels of oil and 174 Mcf of gas on a 16/64 inch choke from the 2,100 feet of lateral….



      'After drilling issues, Goodrich pumping oil in Tuscaloosa Marine Shale' have no comments

      Be the first to comment this post!

      Would you like to share your thoughts?

      © 2012-2014 Shale Markets, LLC. Site designed and maintained by Red Rocks Consultants, LLC